Each lot within the subdivision shall be provided with a public water supply approved by the village and water mains shall be installed in that portion of the public way as is approved by the Village Engineer and Village Board traversing all streets throughout said subdivision. All connections shall be subject to the approval of the Village Engineer and Superintendent of Public Works. The subdivision water system so required shall be connected to the existing village water main system at such point of connection as is most reasonably available, taking into account the size of the main at said point of connection in relation to the water demands reasonably expected within such subdivision. Water main extension shall be so laid out as to prevent dead-end mains wherever possible.
(Ord. 1995-0-25, passed 12-26-95)