11-3-14: FIELD DRAIN TILE SURVEY:
The submission of engineering drawings shall include a completed survey of field drain tiles within the proposed subdivision and drawings and specifications of proposed improvements to redirect drain tiles around conflicting improvements. The survey shall include pipe sizes and depths and shall be in accordance with current DuPage County ordinances. (Ord. 2015-02-05, 2-5-2015)