1359.05 FINAL PLOT PLANS.
   Upon completion of construction and before a certificate of occupancy is issued for a building by the Division of Building Engineering and Inspection, each applicant shall file with the Building Inspector a final plot plan which shall show the final grades of the improvement as constructed. Such plan shall be certified, by a registered civil engineer or surveyor, as to the accuracy of the plan in depicting the actual construction. Such civil engineer or surveyor shall also certify that he or she has made an actual filed observation of as-built conditions and that such conditions are as shown on the plan. The form of such certification shall be prescribed by the City Engineer.
(Ord. 86-38. Passed 8-19-86.)