1359.03 PERMIT REQUIRED; CONTENTS OF PRELIMINARY PLOT PLANS.
   (a)   In addition to all other requirements of the Building and Housing Code, the Zoning Code, other City ordinances or the laws or regulations of the County and the State, and before a building permit is issued by the County Building Department for a building, a person who owns, leases or is in possession or control of any property and who desires to construct a new building or structure or to remodel or reconstruct an existing building or structure wherein the existing grade of the lot or building is proposed to be changed, or a person seeking to change the grade of any property by more than three inches, shall, in addition to obtaining all other permits required by the City, County and State, submit to the Building Inspector an application for a permit and a plot plan of the property, prepared by a registered civil engineer or a registered surveyor, showing where such proposed construction or reconstruction is or will be situated and showing, as applicable, the following:
      (1)   The existing elevation of the center of the street;
      (2)   The existing elevation of the top of the nearest street curb, if any;
      (3)   The existing elevation of the top of the nearest portion of the sidewalk, if any;
      (4)   The existing elevation at each corner of the lot;
      (5)   The first or main floor elevation and the location of adjacent buildings within 105 feet;
      (6)   The elevations of the proposed finished grade of the lot on a suitable contour interval (flat terrain, one foot; hilly terrain, two feet);
      (7)   The proposed elevation of the first or main floor of the building and the lawn grade at the building corners;
      (8)   The foundation and/or slab elevation;
      (9)   The bearings and lot dimensions, the lot and block number or lot and tract number, an arrow showing the north direction and the street name;
      (10)   A reference bench mark established on some permanent object in the near vicinity, which bench mark shall remain undisturbed during construction and available for elevation checks. The bench mark may be assumed to be 100 feet where a City bench mark is not available.
(Ord. 86-38. Passed 8-19-86.)
      (11)   The location and elevation of all existing and proposed on-site sanitary systems, sanitary sewers, water lines, storm sewers and yard drains in or adjacent to the lot;
(Ord. 92-3. Passed 1-21-92.)
      (12)   Any other information that may be required by the City Engineer to ensure that the proposed building elevations and site gradings are compatible with adjacent property and that positive drainage is achieved;
      (13)   The existing elevations of the road ditch, if any, in front of the property at twenty-five foot intervals; and
      (14)   A certification by the registered surveyor that the property has been surveyed and that iron pins are located at all lot corners.
   (b)   Plans shall be submitted with a scale of not less than one inch to fifty feet and on a minimum size sheet of twenty-four inches by thirty-six inches.
(Ord. 86-38. Passed 8-19-86.)