(a) The contractor shall notify the Building Department of any failed test tee riser dye test. All retests shall be made by the contractor in the presence of the Building Inspector.
(b) The Building Inspector shall verify that there is a problem with the test tee and/or related parts of the sewer before a contractor is engaged to repair the defects.
(Ord. 94-47. Passed 11-15-94.)