1343.02 GENERAL SPECIFICATIONS.
   All pipe used shall be Schedule 35 and must be backfilled with #57 wash gravel. The sump pump discharge line shall be at least eighteen inches below grade and tied into a working storm line. The sump pump shall be on a designated electrical circuit. All PVC pipe shall be glued.
(Ord. 94-38. Passed 11-1-94.)