Only portable slush tanks for mud or water shall be permitted in connection with the drilling and reworking operation. The tanks and their contents shall be removed from the premises and the drilling site within ten days after completion of the well.
(Ord. 59-311, passed 3-11-1959) Penalty, see § 113.99