§ 150.65 CONSTRUCTION AND POST-CONSTRUCTION CONTROL MEASURES.
   It is the city's desire to reduce pollutants generated from construction activities before, during, and after a project has been completed. All construction activities shall be controlled in such a manner that reduces the potential of pollutants, including dust and natural sediments from entering the city's storm sewer system; from entering lakes, ponds, rivers, creeks, gullies, ravines, and other natural waterway courses; and from entering adjacent properties. The methods listed in this title are intended to provide options in which to accomplish these control measures.
(Ord. 17-1121, passed 11-21-2017)