1711.03 PLAN SUBMISSION; REVIEW PROCESS; ACTION ON APPLICATION.
   (a)    The building permit application submission and review process shall be coordinated with and integrated into the City Storm Water planning and permitting process.
      (1)    Persons applying to the City for a building permit that includes development and/or construction subject to the provisions of Article 930, Stormwater Management and Surface Water Discharge Control, must submit their request for a stormwater determination to the City simultaneously with the submission of their building permit application.
      (2)    Applicants may choose to submit their request for stormwater determination directly to the Building Official in advance of their application for a City Building permit, but in such case the applicant shall include a copy of their request for stormwater determination with their eventual submission to the City.
   (b)    Upon receipt of a request for stormwater determination, the Building Official or his/her designee shall review same, and issue a formal written determination. The determination shall state:
      (1)    Whether a stormwater erosion and sediment permit is, or is not required, and;
      (2)    Whether a stormwater management and comprehensive drainage permit is, or is not required.
   (c)    The City may not issue a building permit that includes development and/or construction subject to the provisions of Article 930, Stormwater Management and Surface Water Discharge Control, unless and until the appropriate stormwater permit(s), as identified and required by the stormwater determination, has/have been approved and issued.
   (d)    The Building Inspection Department shall examine or cause to be examined applications for permits and amendments therefore within a reasonable time after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the Building Inspection Department shall reject such application in writing, stating the reasons therefore. If the Building Inspection Department is satisfied that the proposed work conforms to the requirements of this Code and the laws and ordinances applicable thereto, the Building Inspection Department shall issue a permit therefore as soon as practicable, subject to the requirements of Section 1711.02. (Ord. 550. Passed 9-5-23.)