(a) To obtain a permit, the applicant shall first file an application in writing on a form furnished by the Building Inspection Department. Such application shall:
(1) Identify and describe the work to be covered by the permit for which application ls made.
(2) Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work.
(3) Indicate the use and occupancy for which the proposed work is intended.
(4) Be accompanied by construction documents and other information as required by the Building and Housing Inspection Department.
(5) State the valuation of the proposed work.
(6) Be signed by the applicant, or the applicant's authorized agent.
(7) Give such other data information as required by the Building Inspection Department.
(8) For development and/or construction, the nature of which is subject to the provisions of Article 930, Stormwater Management and Surface Water Discharge Control, include evidence of compliance with same.
(b) No City Building permit that includes development and/or construction subject to the provisions of Article 930, Stormwater Management and Surface Water Discharge Control of the Codified Ordinances, may be issued without the approval of a stormwater Erosion and Sediment Permit under the provisions of Article 930, unless the Building Official or designee has issued a formal determination stating that a stormwater erosion and sediment permit is not required. Processing of the application for a stormwater erosion and sediment permit shall be coordinated with the building permit application as provided in Section 1711.03.
(c) No City building permit that includes development and/or construction subject to the provisions of Article 930 Stormwater Management and Surface Water Discharge Control, may be issued without the approval of a stormwater management and comprehensive drainage permit under the provisions of Article 930, unless the Building Official or his/her designee, has issued a formal determination stating that a stormwater management and comprehensive drainage permit is not required. Processing of the application for a stormwater management and comprehensive drainage permit shall be coordinated with the building permit application provided in Section 1711.03. (Ord. 550. Passed 9-5-23.)