(A) Any person, firm, or corporation constructing a building or buildings for which a water tap into the municipal system is required shall secure from the city a permit for construction water, the fee for which shall be based upon the total estimated construction cost of the building or buildings according to the following schedule.
Construction Costs | Permit Fee |
Up to and including $80,000 | The current minimum charge in effect for a 5/8 inch to 3/4 inch. (See § 50.02) |
$80,001 and above | The current minimum charge as above plus ($.25) per $1,000 of cost or fraction thereof in excess of $80,000 |
(B) Any person, firm, or corporation requesting temporary water usage for an existing building construction or maintenance project shall submit a fire hydrant meter deposit of ($995) (refundable). Water usage shall be the current minimum charge in effect for a 5/8" - 3/4" meter, plus the current additional charge per 1,000 gallons used over the minimum 10,000 gallons.
(Ord. 3628. Passed 2-27-18; Ord. 3642. Passed 2-26-19; Ord. 3667. Passed 2-25-20.)