A developer, contractor or property owner will provide information as to grade and location of water meter tile before WPWA will make a tap. If the developer or contractor gives the wrong elevation of final grade information, they will be charged at town’s cost for raising or lowering the meter can.
(Ord. passed 7-1-2022)