(B) The introduction of water shall only be made under the direction of the Superintendent of the Water Department and by a properly qualified plumber, who shall use the pipe fixtures and fittings as are set forth in this chapter. The plumber shall make a full report in writing to the Superintendent within 48 hours after completing work.
(C) Before any pipes are covered and before the water is turned on, the Superintendent shall inspect and approve all pipes, connections and fixtures.
(1977 Code, § 29-11)