CHAPTER 749
Topsoil Removal
749.01    Permit from Building Commissioner; fee.
749.02    Twenty feet limit from street.
749.03    Permit not granted when nuisance created.
749.04    Adequate drainage required.   
749.05    Four inches topsoil to be left above subsoil.
749.06    Replanting.
749.99    Penalty.
         
CROSS REFERENCES
Building permits and foundation requirements - see PART THIRTEEN- BUILDING CODE
Landscaping- see BLDG. Ch. 1357