(A) The issuance of a permit based on drawings and/or specifications shall not prevent the Director or his or her authorized agent from thereafter requiring the correction of errors in the drawings and/or specifications or from stopping unlawful building or use carried on thereunder. Wherever any work is being performed contrary to the provisions of this section, the Director may order the work stopped by notice in writing served on any person engaged in the work and/or causing the work to be performed. The order shall be given to the owner or permittee or his, her or its agents.
(B) After due stop order notice has been given, it shall be unlawful for any person to proceed with the work until the corrective work required to be performed by the notice is complied with, within a reasonable specified time. Noncompliance with the requirements as set forth in the stop order shall cause the permit to be voided by the Director.
(C) Any deviation from the approved plans must be consistent with G.S. §§ 160D-1112. An additional permit fee may be charged depending on the extent of variation from the original plans.
(1984 Code, § 2-4-66) (Ord. passed 8-6-1979; Ord. passed 6-18-1990; Ord. passed 4-19-2021)
Penalty, see § 150.999
Building permit and inspection fees for the construction, alteration or repair of buildings, billboards, signs, electrical wiring, rewiring, plumbing, plumbing alterations, heating and air conditioning insulations shall either be based on square footage, cost of construction or inspection service to be performed according to a fee schedule adopted and published from time to time by the Board of Commissioners and kept on file in the offices of the Clerk to the Board, and Division.
(1984 Code, § 2-4-67) (Ord. passed 8-6-1979; Ord. passed 6-18-1990)
(A) The copy of the permit issued shall be kept on the premises for public inspection during the prosecution of the work and until completion of the same. An identification placard provided by the Department showing the permit number shall be conspicuously posted and readily visible for public inspection on the site.
(B) A record of each inspection, signed by the Inspector, shall be entered into the county’s permitting system.
(1984 Code, § 2-4-69) (Ord. passed 8-6-1979; Ord. passed 6-18-1990; Ord. passed 4-19-2021)
Pursuant to G.S. §§ 160D-1111, if, after the work or use authorized by the permit is not commenced within six months from the date of issuance, or if, after commencement of work or use, the work or use is discontinued for a period of 12 months, the permit shall be deemed canceled and the work or use may not commence after this period until a new application is filed and a new permit has been issued under the permit provisions of this section.
(1984 Code, § 2-4-70) (Ord. passed 8-6-1979; Ord. passed 4-19-2021) Penalty, see § 150.999
Upon completion of construction and prior to the occupancy of a building which has been authorized by a permit issued hereunder, the Inspector shall inspect same; and if , on the basis of prior inspections, the work appears to be in conformity with the state law and all ordinances and regulations relating thereto, a certificate of completion shall be issued showing the same.
(1984 Code, § 2-4-72) (Ord. passed 8-6-1979; Ord. passed 6-18-1990; Ord. passed 4-19-2021)