§ 150.081 RESIDENTIAL FEE SCHEDULE.
   A fee for each residential plan examination, building and mechanical permit, and inspection shall be paid in accordance with the following schedule. The factored square footage for building, electrical, and heating and air conditioning permit fees shall be the total of all floor areas under roof excluding crawl spaces.
   (A)   Building.
      (1)   New single-family dwelling: $100 + $0.15/sq. ft.
      (2)   Building additions, accessory structures, including garages, major alterations: $50 + $0.15/sq. ft.
      (3)   Decks, roofing, siding, repairs, minor alterations including basement remodels: $50.
      (4)   Special inspections: $50/inspection.
   (B)   HVAC — for all new construction or alterations requiring installation of heating, ventilating or air conditioning equipment. Base fee includes inspection of one furnace, one central air conditioning unit and ductwork. Additional units require additional fees.
      (1)   New construction, additions and accessory structures: $50 + $0.05/sq. ft.
      (2)   Furnace and/or central air conditioning replacement: $50.
      (3)   Fireplace, wood-burning stoves, chimney, additional furnace or central A/C unit in new construction: $25/unit.
   (C)   Electrical new construction, additions and alterations.
      (1)   New construction: $75 + $0.05/sq. ft.
      (2)   Building additions, accessory structures, including garages, alterations and/or remodeling with no service/panel: $50 + $0.05/sq. ft.: with service/panel: $75 + $0.05/sq. ft.
   (D)   Electrical — special charges in addition to fees noted in § 150.081(C). 
      (1)   Air conditioning: $50 per unit.
   (E)   Electrical — miscellaneous charges.
      (1)   New service or panel: $50.
      (2)   Service entrance and one AC, water heater, range or dryer (added to existing): $50.
      (3)   Service change and wiring to 5 receptacles: $75.
      (4)   Service change and/or entrance + rewire: $50 + $0.05/sq. ft.
      (5)   Temporary service only: $50.
      (6)   AC, water heater, range dryer to 5 receptacles: $50.
      (7)   Basement remodel: $75.
      (8)   Swimming pools, hot tubs and spas: $50.
      (9)   Electric heat: $50.
      (10)   Additional electric meters (duplex, multi-family): $50/meter.
      (11)   Special inspection: $50.
   (F)   Moving of building. $25 plus the cost of any city services provided to facilitate the moving of the building and any additional permits required.
(Ord. 98-152, passed 12-9-98; Am. Ord. 01-125, passed 11-20-01; Am. Ord. 05-026, passed 4-5-05; Am. Ord. 07-106, passed 10-3-07)