Each user, at the time he or she is connected with the waterworks system, shall pay a flat charge to cover the costs of: excavating and tapping the main; furnishing and laying service pipe; furnishing and installing corporation and stop cocks; and furnishing and installing yoke, meter, and, if outside, meter crock.
Water Tap Fees
|
Charge
|
3/4 in. meter tap | $1,200 |
1 in. meter tap | $2,000 |
1 1/2 in. meter tap | $4,000 |
2 in. meter tap | $6,000S |
(Ord. 2017-04, passed 8-28-2017)