CHAPTER 50: SEWER AND WATER USE
Section
General Provisions
   50.01   Definitions
   50.02   Use of public sewers required
   50.03   Private sewage disposal
   50.04   Building sewers and connections; construction
   50.05   Use of public sewers
   50.06   Protection from damage
   50.07   Power and authority of Inspectors
   50.08   Enforcement
   50.09   Conditions of service
   50.10   Building water lines and connections; construction
Cross-Connection Control Program
   50.20   Introduction
   50.21   Local authority and inspections
   50.22   Schedule for inspections and reinspections
   50.23   Protective devices
   50.24   Compliance times
   50.25   Annual reporting and record-keeping
Cesspools; Septic Tanks
   50.40   Permit required
   50.41   Application for permit; fees
   50.42   Construction regulations
   50.43   Dosing chambers
   50.44   Dry well
   50.45   Disposal fields
   50.46   Issuing permit
   50.47   Approval
   50.48   Effective date
Rate and Mandatory Connection
   50.60   Necessity
   50.61   Definitions
   50.62   Operation of system
   50.63   Rates
   50.64   No free service
   50.65   Connection
   50.66   Revision of rates
   50.67   Fiscal year
   50.68   Effective date
 
   50.99   Penalty