(A) Schedule for inspections.
(1) Initial inspections of industrial and commercial premises shall be made as time and available personnel requirements permit.
(2) The schedule for inspections shall be in accordance with the following general outline.
(a) Known or suspected secondary water supply cross-connections shall be inspected first. These secondary water supplies may include surface water, class three wells, recirculated water, and the like.
(b) Known or suspected submerged inlet cross-connections will be inspected next. In general, emphasis will be placed on making inspections initially of all industrial and commercial establishments where cross-connections are known or suspected to exist. A general area review will follow in a logical sequence as time permits. Emphasis will be placed on attempting to inspect all industrial and commercial establishments within a period of six months following approval of this program.
(2005 Code, § 172.004)
(B) Schedule for reinspection.
(1) In order to assure against the hazards of cross-connections, it will be necessary to periodically and systematically reinspect for the presence of cross-connections.
(2) The schedule for reinspections shall be in accordance with the schedule as noted on page 43 of the Cross-Connection Rules Manual. Whenever it is suspected or known that modifications have taken place with piping systems serving a particular water customer, reinspections of the premises will be made as soon as possible.
(2005 Code, § 172.005)
(Ord. passed 5- -1979)