CHAPTER 1: SUBDIVISION REGULATIONS
Section
Article A: Adoption, Introduction
   14-1-1   Introduction and purpose
   14-1-2   Abrogation and greater restrictions
   14-1-3   Interpretation
   14-1-4   Severability
   14-1-5   Repeal
   14-1-6   Title
   14-1-7 through 14-1-9   Reserved for future use
Article B: Definitions
   14-1-10   Definitions
   14-1-11 through 14-1-19   Reserved for future use
Article C: General Provisions
   14-1-20   General provisions
   14-1-21   Land suitability
   14-1-22   Condominium developments
   14-1-23 through 14-1-29   Reserved for future use
Article D: Plat Review and Approval
   14-1-30   Preliminary consultation
   14-1-31   Submission of preliminary plat
   14-1-32   Preliminary plat review and approval
   14-1-33   Final plat review and approval
   14-1-34   Land divisions and consolidations by certified survey map
   14-1-35   Replat
   14-1-36   Determination of adequacy of public facilities and services
   14-1-37 through 14-1-39   Reserved for future use
   Appendix A   Village of Turtle Lake Environmental Assessment Checklist for Subdivisions and Land Divisions by Certified Survey
Article E: Technical Requirements for Plats and Certified Surveys
   14-1-40   Technical requirements for preliminary plats
   14-1-41   Technical requirements for final plats
   14-1-42   Technical requirements for certified survey land divisions; review and approval
   14-1-43 through 14-1-49   Reserved for future use
Article F: Required Improvements
   14-1-50   Improvements required
   14-1-51   Required agreement providing for proper installation of improvements; surety
   14-1-52   Required construction plans; village review; inspections
   14-1-53   Street improvements
   14-1-54   Curb and gutter; drainage facilities
   14-1-55   Sidewalks and bikeways
   14-1-56   Sanitary sewerage system
   14-1-57   Water supply facilities
   14-1-58   Stormwater drainage facilities
   14-1-59   Other utilities
   14-1-60   Street lamps; street trees
   14-1-61   Street signs
   14-1-62   Erosion control
   14-1-63   Partition fences
   14-1-64   Easements
   14-1-65   Extra-sized and off-site facilities
   14-1-66   Acceptance of improvements and dedications
   14-1-67   Site grading
   14-1-68 through 14-1-69   Reserved for future use
Article G: Design Standards
   14-1-70   General street design standards
   14-1-71   Specifications for preparation, construction, and dedication of streets and roads
   14-1-72   Block design standards
   14-1-73   Lot design standards
   14-1-74   Drainage and stormwater management system
   14-1-75   Non-residential subdivisions
   14-1-76   Grading
   14-1-77   Erosion control
   14-1-78 through 14-1-79   Reserved for future use
Article H: Park and Public Land Dedication
   14-1-80   General park and public land dedication requirements
   14-1-81   Land dedication
   14-1-82   Reservation of additional land
   14-1-83   Development of park area
   14-1-84 through 14-4-89   Reserved for future use
Article I: Fees
   14-1-90   Administrative and other fees
   14-1-91 through 14-1-99   Reserved for future use
Article J: Variances; Penalties and Violations
   14-1-100   Variances and exceptions
   14-1-101   Enforcement, penalties, and remedies
   14-1-102   Disclaimers on approvals
   14-1-103   Restrictions for public benefits