UDC Section 8.7.3.C.3.b(8) allows an FLD to use the Maximum Density Option if the project is designed and located to comply with the requirements listed below. The requirements are grouped into three categories:
, siting, and design. These three categories list a total of 31 criteria. Projects meeting a minimum of 20 criteria of the 31 comply with the requirements of this provision.
The Green Building Maximum Density Option requirements may not be modified through the Technical Standard Modification Request process. A request to deviate or waive a Green Building Maximum Density Option requirement must be submitted to the Board of Adjustment for
.