Section
53.01 Generally
53.02 Inspection costs and fees
53.03 Gravity sewer testing
53.04 Lift station and force main testing
53.05 Closed circuit television inspection
53.06 Domestic water main disinfection and testing
53.07 Manhole testing and inspection
Table A: Allowable time at 1.0 psig pressure drop table
Table B: Allowable time at 0.5 psig pressure drop table
Table C: Mandrel table
Table D: Manhole test
Table E: Maximum joint deflection