Sec. 10-2.405. Size and location.
   The City reserves the right to determine the size and location of the service line and meter box in relation to the boundaries of the premises to be served. The customer's pipe to the customer's side of the meter shall not be laid until the service connection is installed unless waived by the Public Works Director. In the event the customer's pipe is laid to that location prior to the time the service connection is installed, and its location at the curb does not correspond with that of the service connection at the curb, the customer shall bear the additional cost and obligation of connecting the service connection with the customer's pipe.
   The meter shall be sized in accordance with the guidelines within the Water Design and Construction Standards. Meters found to be consistently operating in the upper portion of their range may be required to be replaced with a larger meter with payment of the then applicable fees and replacement charges in effect at the time of replacement.
(Ord. 1516-NS, eff. June 5, 2009)