Sec. 10-2.302. Construction water.
   It is the intention by providing this class of service that all construction water be metered. All persons, firms, corporations and public agencies desiring to use water through fire hydrants owned or controlled by the City for purposes other than extinguishing fires shall first sign an application for a fire hydrant permit and for the installation of a construction meter and shall pay for the water used as determined by the meter. The applicant shall specify the location of the fire hydrant to be used and shall make a deposit for a construction meter before the meter is installed. City personnel will move the meter from one fire hydrant to another upon request.
(Ord. 1516-NS, eff. June 5, 2009)