§ 120.57 BLOWOUT PREVENTERS.
   A blowout preventer, control head and other connections for keeping the well under control at all times shall be installed as soon as surface casing is set. The blowout preventer shall be tested against pump pressure at least once every 24 hours. All control equipment shall be in good working order and condition at all times.
(1998 Code, § 50-123) Penalty, see § 10.99