10-8-4: OFF-STREET LOADING REQUIREMENTS:
   A.   Schedule Of Loading Requirements: Every building or structure used for other than residential uses and constructed after the effective date hereof (except for Municipal water treatment plants and related facilities, buildings and structures) shall provide space on the property to be used exclusively for loading and unloading of vehicles. Such space shall be in accordance with the following schedule: (Ord. 3817, 9-5-2017)
Building Gross Floor Area
Required Spaces
Building Gross Floor Area
Required Spaces
0 - 8,000 sq. ft.
1
8,000 - 25,000 sq. ft.
2
25,000 - 40,000 sq. ft.
3
40,000 - 100,000 sq. ft.
4
100,000 - 250,000 sq. ft.
5
250,000 - 400,000 sq. ft.
6
For buildings over 400,000 sq. ft.
6 spaces, plus 1 additional space for each additional 200,000 sq. ft.
 
   B.   Size Of Loading Space: For the purpose of determining adequacy of loading area, each space shall be not less than ten feet (10') in width, forty five feet (45') in length, and fourteen feet (14') in height. (Ord. 3458, 4-5-2010)