6-10-3: DRILLING BY MINISTERIAL PERMIT:
   (A)   Plot Plan Required: No well for use as an injection well and no well for the exploration for or development or production of oil or gas or other hydrocarbon substances may be drilled, and no related accessory equipment, structure or facility may be installed in an industrial zone district until an application for plot plan review has been submitted to and approved by the planning director as consistent with the standards set out in this chapter. In approving application for plot plan review, the planning director may waive any standards set out in this chapter if it is determined that such waiver will not result in material detriment to the public welfare or to the property of other persons located in the vicinity.
   (B)   Nonhazardous Waste Disposal: Disposal of nonhazardous oil field liquid waste or production water is considered an accessory facility only if the facility complies with the following:
      1.   The nonhazardous oil field liquid waste or production water is produced and disposed of within the same designated oil field; or
      2.   The nonhazardous oil field liquid waste or production water disposed of outside the designated oil field of origin is produced by and disposed of solely and only by the same individual, corporation or entity. (Ord. 768-08, 8-19-2008)