5-1-12: MINIMUM DIVERSION REQUIREMENTS:
   (A)   All Covered Projects shall reuse, recycle, or divert from landfills or disposal sites at least sixty-five percent (65%), or per current CalGreen and California Building Code requirements, of all construction and demolition waste unless a lower rate is approved by the City as a part of the project's WMP. Newly constructed non-residential buildings shall reuse and/or recycle one-hundred percent (100%) of plant and land clearing debris including trees, stumps, rocks and associated vegetation and soils resulting from land clearing. Non-residential addition and alteration projects shall divert universal waste from landfilling.
   (B)   Diversion may be satisfied by any of the following methods:
      1.   Documented on-site reuse of the construction and demolition waste.
      2.   Documented delivery of construction and demolition waste to a Material Recovery Facility (MRF), and/or a source separated recycling facility.
      3.   Other methods approved by the City, as set forth on the approved plans issued by the City. (Ord. 840-21, 5-4-2021)