(A) No encroachments, including fill, new construction, substantial improvements or new development shall be permitted within a distance of 20 feet each side from top of bank or five times the width of the stream, whichever is greater, unless certification with supporting technical data by a registered professional engineer is provided demonstrating that such encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge; and
(B) The BFE used in determining the regulatory flood protection elevation shall be determined based on the following criteria:
(3) All subdivision, manufactured home park and other development proposals shall provide BFE data if development is greater than five acres or has more than 50 lots/manufactured home sites. Such BFE data shall be adopted by reference in accordance with § 152.407 and utilized in implementing this subchapter; and
(4) When BFE data is not available from a federal, state, or other source as outlined above, the reference level shall be elevated or floodproofed (non-residential) to or above the regulatory flood protection elevation, as defined in § 152.407. All other applicable provisions of § 152.405 shall also apply.
(Ord. 2005-O3, passed 3-15-2005; Am. Ord. 2020-O3, passed 6-8-2020)