A traffic impact study shall be required for all projects where the Town Manager, or his or her designee, has determined from the information submitted that the site-generated traffic will have a significant impact on the
. Determinations shall be based on the following criteria:
(A) Business and manufacturing uses. Estimated traffic generated by the use exceeds 200 trips/day.
(B) Single-
residential. Estimated traffic generated by the exceeds 400 trips/day.
(C)
. Estimated traffic generated by the exceeds 400 trips/day.
(D)
,
,
. Estimated traffic generated by the exceeds 400 trips/day.
(E) . Estimated traffic generated by the exceeds 400 trips/day.
(Ord. 2005-O3, passed 3-15-2005; Am. Ord. 2016-O14, passed 4-12-2016; Am. Ord. 2023-O6, passed 5-22-23)