No final
for a commercial, residential, or
will be issued until all required site
have been completed. In lieu of completion of required site
, the
of the planned group may enter into a contract with the Town of Swansboro providing for the installation of required
within a designated period of time. Performance of said contract shall be secured by a cash or surety bond which will cover the total estimated cost of the
as determined by the Town of Swansboro; provided, however, that said bond may be waived by the Town
within its discretion.
(Ord. 2005-O3, passed 3-15-2005) (Am. Ord. passed 3-22-2016)