Whoever seeks a permit to construct any structure within the City shall, together with the application for a permit, submit all necessary plans and profiles to demonstrate a plan for the proper and adequate drainage of the lots or land upon which the structure will be built, including a certified survey plan showing permanent markers at all lot corners and on the lot lines at the setback building line. All of such markers shall be set prior to submission of the plan. The plans and profiles shall contain therein provision for removing any existing obstructions within or to any natural watercourse or drainage ditch flowing through or situated within such lots or lands. Insofar as is practical, the plans and profiles shall provide for the continued drainage of such lots or lands in the manner and direction theretofore existing. However, where necessary, the manner and direction of drainage may be changed, it being the intention of Council to provide in the Municipality an overall system of drainage which will safeguard the health and safety of the residents and protect the property located therein.
(Ord. 1962-34. Passed 8-6-62.)
(Ord. 1962-34. Passed 8-6-62.)