1046.15 GRADIENT.
   Sanitary sewer service connections shall be laid at a minimum gradient of six inches per 100 feet of service connection sewer, i.e. one-sixteenth inch per foot. The minimum gradient may be exceeded, but under no circumstance shall service connections be laid at lesser gradients.
(Ord. 1966-135. Passed 9-12-66.)