1163.02 PRELIMINARY PLAT REQUIRED.
   After the preapplication stage, the subdivider shall submit a preliminary plat of the proposed subdivision which shall conform with the requirements set forth herein. The preliminary plat shall be prepared by a qualified registered engineer or surveyor.
(Ord. 85-11. Passed 4-1-85.)