Sec. 6-106. Additional requirements.
   (1)   It will be the responsibility of the grading permit holder to obtain approval of all required agencies for any waterway crossings to be installed if a wet watercourse will be crossed regularly during construction. (i.e., DENR, Corps of Engineers, FEMA, etc.)
   (2)   SWPPP's must be maintained on the site during the progress of the work.
   (3)   If control measures do not achieve stabilization, the permit holder may be required to submit an updated SWPPP or may be required to submit a GECP prepared by a professional engineer.
   (4)   Any on-site debris with potential to be wind-blown onto neighboring properties must be controlled and refuse containers must be covered with a cover intended for the container. Tarpaulins used to cover open dumpsters must be intact and in good repair during use.
   (5)   The City of Spearfish Public Works Department may enter the site to make inspections as needed.