The fee for each construction permit shall, unless otherwise provided, include only those required inspections. The fee for all permits shall normally include not more than one rough and/or one final inspection.
(a) All additional inspections necessitated by the work not being ready or not being properly completed at the time the inspection was called for, all reinspections of violation corrections, all inspections of repairs and/or alterations not covered in the various permit fee schedules, all overtime inspections, all special inspections not otherwise provided for, and all extra inspections made at the request of the owner or the contractor, shall be charged for as follows:
(1) Additional inspections (during normal working hours):
First one-half hour or fraction thereof $35.00
Each additional one-half hour or fraction thereof $25.00
(2) Overtime inspections (on regular working days):
First one-half hour or fraction thereof $45.00
Each additional one-half hour or fraction thereof $40.00
(3) Overtime inspections (Saturdays, Sundays and holidays). The charge for such inspections, when performed, shall be determined on an individual basis and shall reflect the entire cost to the City for the service provided, including wages, double time, minimum reporting time, fringe benefits, car allowances and office clerical time necessitated by the service provided.
(Ord. 443. Passed 4-13-88.)
(b) Failure to secure permit before the work is started:
First failure $100.00
Second failure $250.00
Third and additional failure $500.00
(Ord. 791. Passed 6-2-04.)