When a disconnection from the city utility service is made, such utility disconnection shall be done to the satisfaction of the city. Closure for sewer service shall be at the property line. Closure for water service shall be at the water main or at the curb stop as directed by the city engineer. The sewer or water service closure shall be completed within 30 days of the removal or razing of the building. Closures shall not be covered until they have been inspected by the city. Disconnection from city electric service may only be performed by authorized utility employees.
(1992 Code, § 41-21) (Ord. 56-87, passed 7-20-1987; Ord. 96-03, passed 10-14-2003; Ord. 22-21, passed 2-16-2021)