§ 152.21  WORK NOT TO BE DONE DURING CERTAIN TIMES.
   No grading, excavating, or filling work involving the movement of more than 250 cubic yards of earth or other materials shall be authorized on any single site during the period between December 1 and April 15 in any year if the Building Inspector determines that the work will, if performed during that period, endanger public health or safety.
('91 Code § 151.21)  (Ord. 2222, passed 1-18-68)  Penalty, see § 152.99