No grading, excavating, or filling work involving the movement of more than 250 cubic yards of earth or other materials shall be authorized on any single site during the period between December 1 and April 15 in any year if the Building Inspector determines that the work will, if performed during that period, endanger public health or safety.
('91 Code § 151.21) (Ord. 2222, passed 1-18-68) Penalty, see § 152.99