When it becomes necessary, in laying, putting down or taking up any pipeline or conduit, to make cuts upon the streets, alleys, highways, parkings, sidewalk areas or any other property owned by the City which is paved with asphalt or concrete, or rolled sand with asphalt or oiled, a fee of twenty-five dollars ($25.00) per hour, plus the cost of materials, shall be charged to the applicant. Such fees shall be credited to the Street Department of the City.
(Ord. 1167. Passed 12-19-89.)