In any case where any pipeline covered by Section 808.11 is placed in a ditch where another pipeline covered by such section is being removed, if it is not necessary to deepen the ditch and there is not involved a placing of a high pressure line in a ditch where a low pressure line has heretofore been, a fee per rod shall be collected upon the roddage as determined under Section 808.11. However, in any case where it is necessary to deepen the ditch or the new pipeline being placed in such ditch is a high pressure line taking the place of a low pressure line, an amount per rod shall be charged for the installation of the line being installed and an amount per rod shall be charged for the removal of the line being removed as determined under Section 808.11.
(Ord. 1167. Passed 12-19-89; Res. 20181001. Passed 10-23-18.)