10-3-27: SITE PLAN FOR COMMERCIAL AND INDUSTRIAL DEVELOPMENTS:
   A.   Compliance Required: No lot, plot or parcel of land shall be improved or developed for commercial or industrial purposes or uses nor shall any building permit be issued for the construction of any improvements or buildings for commercial or industrial purposes and uses within the Village until the provisions of this section have been complied with.
   B.   Site Plan Submission: Any person proposing the improvement or development of any lot, plot or parcel of land or applying for a building permit for the construction of improvements or buildings for commercial or industrial purposes and uses shall, prior to the commencement of such improvement or development or at the time of the submission of an application for such permit, submit twelve (12) copies of a site plan, one each to the Village Clerk, Chief Building Official, Planning and Zoning Commission members and Village Engineer. Accompanying each site plan herein required shall be copies of all of the permits from other governmental bodies or agencies required for the contemplated development, improvement or building.
   C.   Information On Site Plan: The site plan shall designate the following:
      1.   Topography of the site and adjoining lands as the same will exist upon completion of the contemplated development or improvement at one foot (1') intervals, including ground cover, slopes, banks, ditches and other like features.
      2.   Location, arrangement and exterior height dimensions of all permanent buildings and aboveground structures.
      3.   Location, arrangement and dimensions of vehicle parking spaces, width of aisles, bays and angle of parking, together with the type of parking surface.
      4.   Location and dimensions of vehicular entrances, exits and driveways.
      5.   Location and dimensions of pedestrian entrances, exits, walks and walkways.
      6.   Location and dimensions of the specific storm or surface water drainage system to serve the site, together with connections to off site drainage facilities.
      7.   Location, dimensions and capacities of all utilities to serve the site including natural gas, telephone, electricity, water and sanitary sewer, together with connections to connecting off site utility lines and mains.
      8.   Location, size, height and orientation of all signs other than signs flat on building facades. (Ord. 93-695, 6-15-1993)
      9.   Photometric plan showing the location, size, height and design of all sources of illumination to be constructed or installed and their supporting structures (including existing or proposed illumination on adjacent rights-of-way), orientation and level of illumination in foot-candles (at ground level) throughout the entire property, and product catalog sheets with manufacturer's specifications for all illumination fixtures. (Ord. 02-1127, 10-8-2002; amd. Ord. 20-1982, 8-25-2020)
      10.   Location and dimensions of all stormwater retention ponds and facilities.
      11.   Location, arrangement and dimensions of vehicle loading and unloading spaces, areas and docks.
      12.   Location, dimensions and materials of walls and fences.
   D.   Compliance With Zoning And Village Regulations: The site plan or addendum thereto shall further contain information showing compliance with all of the requirements of the zoning district regulations of this title and all other applicable provisions of other Village ordinances.
   E.   Examination Of Site Plan: The Village Engineer shall examine and review the site plan to determine whether the same complies with this title and all other Village ordinances, ensures adequate utility service to the development or building and provides for proper storm or surface water retention and drainage whether the contemplated development, improvement, building or facilities will harm or damage surrounding properties or overload public and utility improvements beyond their capacity and shall submit his written recommendation of approval, denial or modification to the Trustee in charge of storm or surface water drainage, Plan Commission, Chief Building Official, Zoning Officer and Village Administrator for their review and recommendation for approval or denial.
   F.   Denial Of Site Plan: In the event a site plan does not receive all required recommendations within sixty (60) days, it shall be deemed denied.
   G.   Village Board, Final Decision: In all cases the Village Board of Trustees shall make the final decision as to the approval or denial of a site plan, and shall consider in its decision the recommendation or lack thereof from the trustee in charge of storm or surface water drainage, Chief Building Official, Zoning Officer, Plan Commission and Village Administrator. (Ord. 93-695, 6-15-1993; amd. Ord. 20-1982, 8-25-2020)