§ 4-3-124 SAME; SPECIFICATIONS; PRESENCE; PLUMBING INSPECTOR.
   Taps of the main sewer, when permitted, shall be made by using an approved wye (Y) saddle. Taps of right angles to the direction of flow are prohibited. All taps shall be made in the presence of the Plumbing Inspector.
(Ord. 1116, passed 2-25-1957; Ord. 2382, passed - -1978)