§ 4-3-123 TAP; PERMIT; REQUIRED.
   The sewer main shall not be tapped except upon written permission of the Plumbing Inspector. Such permission may be granted in event a proper junction wye (Y) on the sewer main is not available.
(Ord. 1116, passed 2-25-1957; Ord. 2382, passed - -1978)