§ 4-3-105 SERVICE LINE; DEPTH; PROTECTION FROM FREEZING.
   All service pipe from the curb box to the building shall be laid not less than four and one-half feet below the surface of the ground. In all cases, service lines must be so protected as to prevent rupture from freezing.
(Ord. 1116, passed 2-25-1957; Ord. 2382, passed - -1978)