§ 51.062 PERMITS; REQUIRED FOR EXISTING CONDITIONS AND NEW CONNECTIONS.
   (A)   Existing conditions. Any significant industrial user which discharges non-domestic waste into the sanitary sewer system prior to the effective date of this section and who wishes to continue the discharges in the future shall, within 90 days after such date, apply to the Authority Board for an industrial discharge permit and shall not cause or allow discharges to the POTW after 180 days from the effective date of this section except in accordance with a permit issued by the Authority.
   (B)   New connections. Any significant industrial user proposing to begin discharge of non-domestic waste into the KLSWA system must obtain an industrial discharge permit prior to beginning the discharge. An application for this permit must be filed at least 60 days prior to the anticipated start-up date.
(Ord. passed 4-24-1995) Penalty, see § 51.999