You are viewing an archived code
Development controls, including height and bulk, in the "TB" bulk district are governed by the Development Controls and Design Guidelines for the Transbay Redevelopment Project document and companion documents as part of the Transbay Redevelopment Plan as approved by the Planning Commission on December 9, 2004 and January 13, 2005. Building heights, locations, setbacks, and bulk limits are specifically established in these documents. Building heights associated with bulk designation "TB" on Sectional Map No. 1H of the Zoning Map are generalized, and describe a range of building heights per block, with the largest number describing the maximum tower height per block, and the smallest number describing the lowest maximum building height per block.
(Ord. 94-06, File No. 050182, App. 5/19/2006)