(a) Public Supply or Project System. All water mains, lines and fire hydrants shall be installed from each lot in the subdivision to, and connected with the public supply or project system as indicated on the plans and data for conditional approval.
(b) Wells On the Lot. Required test wells shall be drilled and certified as to quality and quantity of water by the State or local health officer.
(Ord. 731120-127. Passed 1-15-74. )
(Ord. 731120-127. Passed 1-15-74. )