17.832.020   Preparation, form, and content of final and parcel maps.
Final or parcel maps shall be prepared by or under the direction of a registered civil engineer or licensed land surveyor in the manner required by the Subdivision Map Act, and shall be prepared to the satisfaction of the director of public works related to:
   A.   A final or parcel map's general form such as: page layout, page numbering, sheet index, map index, scale, drafting standards, dimensioning, lot numbering, orientation, and related details.
   B.   A final or parcel map's content such as information shown on the title sheet, the name of map, acknowledgements, statements, certificates, and related content.
   C.   A final or parcel map's technical information such as: determination of existing boundary lines; establishment of new lot lines; basis of bearing; level of accuracy; reference to recorded documents, private easements, public ease-ments, and rights of way; dedications, reservations, exclusions, and related information.
   D.   Supporting data such as closure calculations and title reports.
   E.   A final or parcel map when filed shall be in a condition such that legible prints and electronic files can be made therefrom. (Ord. 2017-0009 § 23)