12.14.120   Permit application requirements.
   A.   Applications for any permit required under this chapter must include:
      1.   The exact proposed location for the facilities, including such specifications, drawings, maps, and other illustrations as are required by the director, clearly describing the telecommunications facilities proposed to be installed or modifications to be made.
      2.   A field inspection report.
      3.   A radio frequency report, as required in the telecommunication facility standards.
      4.   Permit application fees.
   B.   The applicant shall deposit sufficient funds in a draw-down account held by the city to cover all city permit costs, including all costs to process any encroachment permit. The city shall provide a final billing statement for each application reflecting the amount charged.
   C.   The permit applications required by this chapter may be filed by an applicant while any other application is pending. No permit will be issued until all other required city, state, or federal permits have been obtained by the applicant, and all other state, federal, and city requirements have been met. (Ord. 2020-0018 § 2)