Heating permit fees shall be as follows:
Fee | ||
(a) | Alteration or Addition | |
Adding warm air or cold air runs or blower, etc. | $ 5.00 | |
(b) | Replacement | |
Gravity for gravity or forced air for forced air | 35.00 | |
(c) | Gravity System | |
Twelve heat runs | 35.00 | |
For each heat run in excess of twelve | 1.00 | |
(d) | Forced Air System (heat pump-electric) | |
Twelve heat runs | 35.00 | |
For each heat run in excess of twelve | 1.00 | |
(e) | Conversion Burners, Floor Furnaces and Wall Furnaces | |
All types | 10.00 | |
(f) | Unit Heaters | |
With duct work | 10.00 | |
(g) | Central Air Conditioners | |
First additional 24,000 B. T. U. | 12.00 | |
Each additional 12,000 B. T. U. | 6.00 | |
(h) | Loop System | |
Nine openings | 10.00 | |
For each opening in excess of nine | 1.00 | |
(Not more than three openings between feeders) | ||
(i) | Boilers | |
New, first 125,000 B. T. U. | 35.00 | |
Each additional 50,000 B. T. U. | 10.00 | |
Replacement | 35.00 | |
When making application for a heating permit, the applicant shall include total B.T.U. heat loss after “Total Load Connected;” and indicate the number of heat runs after “Remarks”.
(Ord. 1370. Passed 1-14-80.)